Email this page Email Print this page Print Feed Feed

More Capstone Packages Heading To Eagle Ford

Posted on April 9, 2012

Capstone Turbine Corp. received orders totaling 10 MW from two oil and gas producers in the Eagle Ford shale play.

The orders stem from a new customer that requested five C1000 power packages for five separate remote central gathering sites and from a producer with multiple Capstone microturbines already in the field. This latest follow-on order includes seven C600 and one C800 power package.

Capstone distributor Horizon Power Systems secured the two large orders, which are for 13 power packages set to supply prime power at each central gathering site. All 13 of the power packages are scheduled to be installed and commissioned in the next three months.

All 13 C1000 series microturbine packages will provide prime power to central processing facilities and metering stations. The microturbines, fueled by pipeline gas, will produce electricity to power the onsite equipment, including heaters, pump motors, compressors and distribution panels.

For more information: www.capstoneturbine.com

Add your comment: