Burckhardt Compression Returns For A Revamp

By CT2 Staff16 May 2018

Burckhardt Compression has received a contract from Golar Management to revamp a Laby-GI compressor operating on a floating storage regasification unit (FSRU) near Jamaica.

The compressor has spent the past 10 years on the FSRU vessel Golar Freeze, being used as a minimum send-out (MSO) compressor with a discharge pressure of 653 psig (45 barg).

Golar Management, however, decided to repurpose the compressor to deliver gas to Jamaica’s power utility JPS, a move that requires an additional compression stage, extra auxiliaries, piping and other modifications, such as increasing the discharge pressure to 943 psig (65 barg).

Golar Management, based in Norway, is an independent owner and operator of LNG carriers and FSRUs, as well as a developer of floating liquefaction vessels (FLNGVs). FSRUs are designed to transit and transfer LNG through oceanic channels. FSRUs also have the capability to convert LNG to natural gas in order to transfer it to onshore gas pipeline and power production operations.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, Diesel Gas & Turbine News; News features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
CONNECT WITH THE TEAM
Jack Burke Senior Editor, Diesel Gas Turbine Tel: +1 262 754 4150 E-mail: jack.burke@khl.com
Gabriele Dinsel Sales Manager Tel: +49 711 3416 74 71 E-mail: gabriele.dinsel@khl.com
CONNECT WITH SOCIAL MEDIA
Latest News
Hydrogen webinar set for Feb. 25
Webinar to be hosted by Diesel & Gas Turbine Worldwide
Aggreko wins 25.9MW hybrid power project in Chile
Contract with mining company Gold Fields will comprise solar and diesel power for the new Salares Norte mine